Home → Digital twin → MES and Digital Twin
Digital twin
MES and Digital Twin
We do not replace your MES — we link it with 1C, ERP, CRM, the warehouse and equipment, so the director sees the whole plant in a single window.
Tell us which MES you use and what you need to see in one window. We will come back with a first-stage plan.
In short
BizDNAi does not replace your MES: it joins one contour together with 1C, ERP, CRM, the warehouse, equipment and communication channels.
An enterprise Digital Twin adds what MES usually lacks: a single picture of production, warehouse, quality and finance in one window.
Equipment is connected through sensors, relays, counters and PLCs; ZigBee, Wi-Fi, Tuya, Modbus and MQTT are supported.
Implementation starts with an enterprise audit: we record the real processes, data and bottlenecks.
What is united around MES
- 1C and ERP
- CRM
- MES
- warehouse and stock
- PLCs, SCADA and sensors
- SQL databases
- Excel, mail, Telegram, WhatsApp
- IP telephony and API
How it works
MES stays your production system. BizDNAi links it with the other systems and with equipment so data does not fragment.
The director dashboard collects production, warehouse, finance, warnings, staff, quality, documents and KPIs on one screen.
What the enterprise gets
One screen instead of dozens of programs: production, warehouse, finance, warnings, quality and documents visible at once.
Data from MES, 1C and equipment reconciles instead of each living its own life.
Problems are visible earlier: the system warns about deviations before downtime.
Setup time
This is an implementation project: the timeline depends on your MES, the number of systems and equipment and is agreed after the enterprise audit.
Ready 1C, CRM and ERP integrations inside the project — usually 1–3 days after access is provided.
What to clarify before the start
| Question | Why it matters |
|---|---|
| Which MES is used | The data exchange method depends on it |
| Which data is needed in the common contour | The scope of integrations and reports |
| Which equipment to connect | Sensors, PLCs, SCADA and protocols |
Frequently asked questions
Do you replace MES?+
No. MES stays your production system. BizDNAi does not replace existing systems; it unites them.
Do you have your own MES?+
On the BizDNAi site MES is listed as one of the systems we integrate with. A proprietary MES is not claimed on the site — ask us about your specific case.
What does a Digital Twin add if we already have MES?+
The overall picture: production, warehouse, quality, finance and warnings in one window instead of separate systems.
What equipment can be connected?+
Sensors, relays, counters, machines, PLCs; protocols ZigBee, Wi-Fi, Tuya, Modbus, MQTT. SCADA and SQL are also supported.
Free · no obligation
Free digital audit
We will review your data and show where the discrepancies, risks and losses are. You get a report with specifics — even if you decide to work with another contractor.
The price depends on your situation, after the free audit.